I've attached a picture where I have vias tying the ground pins from the FV-1 to the ground plane, would this be ok to do?frank wrote:An unbroken pour is best.
My hope is to run all the leads on the top layer so the bottom layer could be just the ground pour
https://goo.gl/photos/qgjPzXNSqn7rppY29